Dodge Church

Overview

Status

NO. OF STORIES

1

SQ. FOOTAGE

2500

In the wake of the 2020 Riverside fire — which burned 138,000 acres in Clackamas County Oregon — the Dodge Community Church was burned to the ground. Carpentry Plus was able to re-purpose remaining material from a previous project to rebuild the church at a significant savings to the congregation. We are proud of the part we were able to play in helping rebuild our community, that was so significantly impacted by the 2020 wildfires.

Specifications

Construction Cost:

Construction Type:

V-B

Building Type:

Assembly (Worship, Restaurant, Theater)

Material Types:

Role:

Supply-Install of Mass Timber

Design Team

Developer :

Dodge Church

Architect:

Orange Wall Studios

Structural Engineer:

Stonewood Engineering

Gc:

Carpentry Plus Inc

Suppliers:

Structurlam

Scroll to Top